Modest progress this week.
204 N. Bayview
I was about to conclude that there was no change from last week until I noticed the roof, where the unshingled corner has finally been covered.
308 N. Bayview
Additional framing has been added. This photo from the rear shows the extent of the additions to the original core structure.
351 N. Summit
No change.
112 N. Summit
Trim has been added on top of the brickwork under the roof.
At some point in the past few weeks, the door to the rear sun porch was installed, and the brickwork around it has been completed. All that is left undone now is the dormer.
The major accomplishment this week is interior painting, including the garage (shown here). The entire downstairs (I didn’t check upstairs) has been painted the same color, a dark beige.
111 Magnolia Avenue
Some exterior plywood sheathing has been added, as well as floor joists for the second story.