The theme today, as you will see, is doors.

252 N. Bayview Street

The house now has a front door, shown here both outside and in. I could not see any other changes inside.

Outside, work on the brick veneer has progressed, as shown on the north and south sides.

352 N. Summit Street

The front elevation drawing below was posted on the builder’s Facebook page.

At the site, considerable progress has been made toward that goal.

351 N. Summit Street

Doors! Here’s the front door.

And the doors from the living room to the patio.

And the doors from the breakfast area to the screened porch.

And on the west side, in the breezeway between house and garage.

This door inside may be destined for the garage the other end of the breezeway, opening into the garage.

Since the last time I was inside, the fireplace surround has been added.

Advertisement
This entry was posted in Construction. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s