Bluff Neighborhood Construction Report 2-26-17

Very little to report today, I’m afraid.

352 N. Summit Street

The staircase has been finished.

The space I identified as a “linen closet” in the hall bath upstairs now has this built-in.

Aside from those two changes, I could not identify anything else new in the house: the hearth was still in its crate; the oven and range have to await countertop; the tile in the bathrooms has not been grouted; no more flooring has been completed.

351 N. Summit Street

Cabinetry has been installed in the kitchen, along with the sink. Men were working in the living and dining rooms on some kind of finishing.

59 N. Summit Street

Men were at work toward the back of the house, but the staircase and loft, reportedly slated for demolition, are still in place.

Here’s the best shot I could get of the side addition (surrounding foliage makes photography difficult).

Work seems to be currently focused on the addition in back.

Shooting into the sun didn’t help this photo, but it gives a bit of an idea of the overall building.

111 Magnolia Avenue

This house is for sale. Readers who followed the progress of its construction may be interested in looking at exterior and interior photos of the finished house here.

Advertisements
This entry was posted in Construction. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s