Bluff Neighborhood Construction Report 5-21-17

Today’s report will be short and sweet.

352 N. Summit Street

The house was securely locked up again today, but the Palmetto Street lanterns from The Coppersmith have been mounted.

Peeking through the sunroom door, I can see that the kitchen faucet valve has been installed (but not the soap dispenser).

The fridge (GE Café™ Series ENERGY STAR® 27.8 Cu. Ft. French-Door Refrigerator with Hot Water Dispenser) and oven (GE Café™ Series 30″ Built-In Single Convection Wall Oven) have been delivered.

The cooktop has been temporarily removed, probably to facilitate installation of the oven.

And here’s a view of the whole house from the street.

351 N. Summit Street—Parting Shots

Since the homeowners have definitely moved in, I offer just two views of the finished house (well, mostly finished—the screened porch hasn’t yet been screened).

Advertisement
This entry was posted in Construction. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s