Bluff Neighborhood Construction Report 6-25-17

Just a few more photos of the only construction site I’m still actively monitoring.

352 N. Summit Street

The front porch has been screened. Here’s how it appears from the street and from the entry (the door has not yet been screened).

The previously unidentified wiring beside the door (above the doorbell) is now attached to a Seco-Larm Enforcer security camera.

The house was securely locked up today, but, peering through the sunroom door, I could tell that the kitchen faucet and handle have finally been completely installed. The Badger box was no longer on the counter, so I assume the disposal has also been installed.

Making a circuit of the house, I found this attractive hose reel.

And the rear courtyard now sports a fountain.

Here’s a view of the finished rear entrance, with a close-up of one of the lanterns.

Advertisements
This entry was posted in Construction. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s