As of yesterday, the construction at 204 N. Bayview has become much more visible from the street, with the front and side additions framed up.
At 308 N. Bayview, screen has been removed from the front porch, and a portolet has appeared in the yard.
At 112 N. Summit, the house is “dried in” (exterior walls and roof covered with plywood and Tyvek), though the floor plan is still unfathomable to me.