Monthly Archives: June 2015

Bluff Neighborhood Construction Report 6-28-15

Today’s report will be somewhat abbreviated because I got caught in a brief deluge and had to cut my walk short. 204 N. Bayview The dumpster is gone, the Bobcat is back, and landscaping is in progress. No further report … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 6-21-15

This week’s progress ranges from almost none to approaching completion. 204 N. Bayview The front walk has been completed and the front yard graded ready for landscaping. The front porch has been screened and the house number added. For some … Continue reading

Posted in Construction | Leave a comment

More Neighborhood Improvements

The focus in this installment is on driveway upgrades. This April 2011 Google Street View image of 58 N. Summit Street shows that the driveway was deteriorating asphalt. By 2015, when it was replaced with poured concrete, it was probably … Continue reading

Posted in Uncategorized | Leave a comment

Bluff Neighborhood Construction Report 6-14-15

204 N. Bayview Greenery in the dumpster and a Bobcat in the front yard suggest that grading and landscaping may be imminent. Painters were touching up the porches when I passed yesterday. Although you can’t tell it in this photo, … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 6-7-15

Some baby steps and some giant leaps this week. 204 N. Bayview Carriage lamps have been added on either side of the porch, and the stair landing has been poured. The courtyard between house and outbuilding has been completed. In … Continue reading

Posted in Construction | Leave a comment