Monthly Archives: August 2015

Bluff Neighborhood Construction Report 8-30-15

Noticeable changes large and small. 308 N. Bayview The most dramatic change this week is that the old shed has been demolished. Inside, the new cabinetry in the kitchen has been painted, and the glued-up island countertop (not butcher block … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 8-23-15

I was out of town last weekend, so this weekend I was expecting to see dramatic and significant changes in the three sites I’m currently following. Bottom line: two out of three ain’t bad! But buckle up because I took … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 8-9-15

204 N. Bayview Still a few more developments here. The rear courtyard has been set up as an outdoor dining area. And in the carport, as expected, the concrete block construction has become an outdoor kitchen with grills from Big … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 8-2-15

Although this is being written and posted on Monday, the photos were taken on Saturday and Sunday as usual. I just ran out of time Sunday. 204 N. Bayview Additions to this site continue. Planters have been added in front … Continue reading

Posted in Construction | Leave a comment