Bluff Neighborhood Construction Report 5-31-15

Not much to report today. 204 N. Bayview The porch step bannisters have been completed, and a path to the driveway sketched out. AC units on both sides of the house (one on the north, two on the south) were … Continue reading

Posted in Construction | 1 Comment

Bluff Neighborhood Construction Report 5-24-15

Very little to report this week. 204 N. Bayview Posts for a handrail have been added to the steps and a landing pad outlined. This outside shower (on the south wall outside the master bathroom) even includes a foot washer … Continue reading

Posted in Construction | Leave a comment

Neighborhood Improvements

This post is a collection of “upgrades” to homes in the neighborhood within the past year or so. The most recent development is a major addition to the house at 59 N. Summit Street. This Google Street View image shows … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 5-17-15

Progress is being made by baby steps. 204 N. Bayview The porch columns have been completed. 308 N. Bayview The emphasis inside is on woodwork. Paneling has been added in the front hall, and window and door frames and crown … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 5-10-15

Not much to report this week. 204 N. Bayview The side porch is now revealed to be the landing for a spiral staircase. Although this will be a practical fire escape, I can also envision it for a bride’s dramatic … Continue reading

Posted in Construction | Leave a comment

Bluff Neighborhood Construction Report 5-3-15

Several interesting developments this week. 204 N. Bayview Surprise! The front porch has been screened. When I passed, a worker was preparing to install painted sections of railing (including one of the fancier sections for the upstairs porch). 308 N. … Continue reading